
GRID: New England public advocates say they’re concerned with the structure and cost of Eversource’s proposed $384 million transmission line upgrade project, which they say is overkill given that much of the line is still in good shape. (NHPR)
‍
FOSSIL FUELS: A Bitcoin miner in upstate New York sues the state after being denied an air permit renewal for the gas plant powering its operations. (Gothamist)
‍
SOLAR:
‍
BATTERIES: A Hydro-Québec subsidiary says its first utility-scale battery energy and storage system in the U.S., a 3 MW facility in Troy, Vermont, is now operational. (news release)
‍
BUILDINGS: New York’s governor is “facing pressure on all sides” amid final rulemaking that aims to set emissions standards for refrigerants in commercial refrigerators, residential heat pumps and chillers over the next decade. (E&E News, subscription)
‍
BIOENERGY: In Pennsylvania, a renewable natural gas plant at a Bethlehem landfill officially opens, with enough capacity to heat 14,000 homes. (Lehigh Valley News)
‍
ELECTRIC VEHICLES:
‍
AFFORDABILITY: Connecticut’s U.S. House delegation wants the state’s utility commission to help alleviate financial pressure on residential ratepayers facing high utility bills. (Hartford Courant)
‍
POLITICS: A New Hampshire newspaper details how the state’s four gubernatorial candidates have described their future climate and energy policies. (New Hampshire Bulletin)
‍
COMMENTARY:
‍